Reconstruction
The following streets (or portions thereof) are scheduled for full reconstruction – roadway, sewers and watermain – necessitating road closures during the construction period:
- Angelina Avenue
- Passchendaele Lane
- Cedar and Dufferin
- Bloor Street
- Central Street West Aqueduct Repairs
- Trunk Road
The following streets are scheduled to be resurfaced:
- McNabb Street (Pine Street to Lake Street)
- St. Georges Avenue (John Street to Birch Street)
- Wellington Street West (Lyons Avenue to Henrietta)
- Second Line West (Third Avenue to Edison Avenue)
- Sunnyside Beach Road (Double culverts to Shatruck Drive)
- Moss Road (Korah Road to Third Line)
For more information please contact:
Carl Rumiel
Director of Engineering
Corporation of the City of Sault Ste. Marie
Phone: (705) 759-5379
E-mail: [email protected]