Weather

News And Views

Classifieds

Announcements

Entertainment

More Local

Shop Local

Search The Web

Google Search

Local News

Details of final Goulais Wind Farm open house announced

Tuesday, September 18, 2012   by: SooToday.com Staff

Sprott Power Corp. has announced the following details for the final Goulais Wind Farm public open house:

Date:

Tuesday, September 25, 2012 (format: come-and-go)

Times and places:

1 p.m. to 3 p.m., Captain Tilley Community Centre, 592 Highway 552 West, Goulais River, Ontario

and

5:30 p.m. to 8 p.m., Aweres Public School, 185 Highway 556, RR2, Sault Ste. Marie, ON

The proposed 25 MW Goulais Wind Farm is planned to be constructed on private land within the Pennefather and Aweres townships.

The wind farm site is located on the plateau between Highway 17 and the Prince II Wind Farm approximately five km northwest of Heyden and five km south of Goulais River.

The project has a 20-year, 25 MW Feed-in-Tariff contract with the Ontario Power Authority.

Written copies of the supporting draft documents are available for public inspection online; at the Sault Ste. Marie North Planning Board, 669 Wellington St. East, Sault Ste. Marie, ON; and at the Goulais River General Store Downtown Ltd., 617 Highway 552 West, Goulais River, ON.

Comments
0
Please sign in to post a response
Note: Comments that appear on the site are not the opinion of SooToday.com. Keep discussions civil and on topic. Refrain from obscenity and don't post anything that your grandmother would be ashamed to read. Those who do not abide by these guidelines will have their membership revoked without notice. If you see an abusive post, please click the link beside the post to report it.
Myers Chiropractic Clinic
Solo TrattoriaDavid Orazietti MPP
Advertising | Membership | Terms of Service | Privacy Policy | About SooToday.com | Contact Us | Feedback

Copyright ©2013 SooToday.com - All rights reserved